                                                         Service Area Specified Period Compansation payble to
affected consumer
Manner of
payment
Normal Fuse off 
Urban areas 6 Hrs Rs.100 in each case of default Automatic
others areas 24 Hrs
Line Breakdowns
Urban areas 12 Hrs Rs.100 to each affected consumer To be Claimed
Others areas 24 Hrs
Distribution Transformer failure
Urban areas 24 Hrs Rs.200 to each affected consumer To be Claimed
Others areas 48 Hrs
Period of Scheduled outages
Maximum duration in a single stretch 12 Hrs Rs.200 to each affected consumer To be Claimed
Restoration of supply
Voltage Variation
No expantion/enhancement
of network is involved
15 days Rs.200 in each case of default Automatic
Up-gradation of distribution
 system is required
Rs.500 in each case of default
Harmonics
EHT connections   To be decided by the Commission
at appropriate time
 
HT connections    
Meter Complaints 
Checking and inspection of correctness of the meter 7 days Rs.100 in each case of default To be Claimed
Replacement of slow ,creeping or stuck up meters 30 working days Rs.100 in each case of default Automatic
Replacement of burnt meter( cause attributable to the consumer) 30 working days Rs.200 in each case of default Automatic
Replacement of burnt meters in all other cases. 15 days    
Applications for new connection/additional load connection feasible from existing network
Release of supply 3 days Rs.100 in each day of default Automatic
Network  expansion / enhancement  required for providing connection
Release of supply- Low Tension
(Including Agricultural)
one week Rs.100 for each day of default To be Claimed
Release of supply- High Tension
11 KV supply
21 working days Rs.500 for each day of default To be Claimed
Release of supply- High Tension
33 KV supply
60 working days Rs.500 for each day of default Automatic
Release of supply- Extra High Tension
services
30 working days
Erection of Substation required
for release of supply
  Rs.1000 for each day of default Automatic
 Transfer of ownership and conversion of service
Title transfer of ownership 15 days Rs.100 for each day of default Automatic
Change of category 15 days Rs.100 for each day of default Automatic
Conversion from LT 1-ph to LT 3-ph 30 days
Conversion from LT to HT and vice-versa 60 days Rs.200 for each day of default Automatic
Resolution of complaints on consumer's bill
Resolution of complaints 30 days Rs.50 for each day of default Automatic
Reconnection of supply following disconnection
Urban areas 4 Hrs Rs.100 for each day of default Automatic
Others areas
 
 
 
 
 
  North Eastern Electricity Supply Company of Orissa Ltd.
Corporate Office: At:Januganj, Balasore, Pin:756019,
Phone:(06782)-269864 Fax No:(06782)-263259
E-mail Id :nescoltd@hotmail.com ,
nescoltd@rediffmail.com, nesco@nescoorissa.com
Copyright © 2007 NESCO Powered By: ORISSADISCOMS CSO-IT